- The sub floors were finished in the duplex bathrooms
- We put in the floor over the sub floor in the bathrooms
- The bedroom walls were sanded and varnished on the right side of the Duplex
- The big room in the right side of the duplex has also been sanded and varnished
- Painted the ceilings
- New linoleum tile was put down in both bedrooms
- The Nashoba Tech electrical kids came and played with some electricity
- The handicap ramp was nearly complete, it needs the landing at the top and bottom done.
- The new roof on the batcave has been completed.
- The water in the pond is definitely safe for swimming in

Neil Approves
Check out this floor and more pictures on the photo album
- The Nashoba Tech electrical kids came and played with some electricity
- The handicap ramp was nearly complete, it needs the landing at the top and bottom done.
- The new roof on the batcave has been completed.
- The water in the pond is definitely safe for swimming in
Neil Approves
Check out this floor and more pictures on the photo album
swimming in jeans, good thing they're waterproof.
ReplyDelete