Wednesday, May 12, 2010

A couple weeks of hard work


Sorry we haven't updated in a while, it has been a truly busy couple of weeks over at the camps. I'm going to make a crazy list about everything that got done last week and the remaining that got done the week before that.
- The sub floors were finished in the duplex bathrooms
- We put in the floor over the sub floor in the bathrooms
- The bedroom walls were sanded and varnished on the right side of the Duplex
- The big room in the right side of the duplex has also been sanded and varnished
- Painted the ceilings
- New linoleum tile was put down in both bedrooms
- The Nashoba Tech electrical kids came and played with some electricity
- The handicap ramp was nearly complete, it needs the landing at the top and bottom done.
- The new roof on the batcave has been completed.
- The water in the pond is definitely safe for swimming in











Neil Approves




























Check out this floor and more pictures on the photo album





1 comment:

Followers