Saturday, May 1, 2010

Friday and Saturday


Friday in the duplex, we cleaned the ceiling, added the strapping back on to the ceiling, finished pulling out the bathroom floors, started sistering the floor joists in the left bathroom. The ceiling in the bedroom on the right side of the duplex is done as well. The batcave group worked on their roof, and the handicap ramp group worked on the foundation of the bottom of the ramp some more and made hamburgers.
On Saturday night, Ellen and Michael worked on sistering the floor joists in the right side bathroom. One more sister has to be cut and added, along with some additional bracing for the new members. We will finish that up monday so that the floor can be put in.

Remember to check out our pictures on the web album!