On Monday, we returned to the camps for another busy day. The handicap ramp team came back to find a platform built for the landing at the top of their ramp. Some members of the team working in the batcave were missing so they worked on removing some bathroom fixtures and then helped out in the duplex. In the duplex the teams were happy to have the additional help. There was all sorts of sanding and cleaning accomplished, along with the removal of the bathroom ceilings, and other sections of ceiling that need to be replaced. When we removed the ceilings in the bathroom, we were attacked by falling treasures from long ago when the duplex was a staff cabin (see picture) and had to spend a long time cleaning that up. We were showered again by animal droppings when we pulled out ceiling from other rooms.
If you would like to see more pictures of the project, here is a link to a photo album we're putting the pictures in.
http://picasaweb.google.com/mikesbikester/CabinFeverAtTheEastBostonCamps#
that Mike Johnson, he's a hipster doing all this blogging.
ReplyDelete